LCCM07写真

Laser Cavity Compton Meeting 20-22/Nov/2007, KEK

20th

   10:00-12:00 Inspection in the DR tunnel
   12:00-13:30 Lunch
   13:30-15:00 Inspection in the DR tunnel
           with Photo Presentation of the installation operation (S. Araki)
   15:00-15:30 Break
   15:30- Discussions (meeting room in the 3rd building)
            Design of LAL Cavity (C. Richard)
            Asian Cavity (H. Shimizu)

21st 

   9:30-12:00 Discussions (meeting room in ATF)
           X-ray Cavity (K. Sakaue)
           Status of FB of LAL cavity (D. Jehanno)
           Design and installation of the LAL 4-mirror cavity
           (a) date of the installation
           (b) design considerations on vacuum
           Comments from Araki-san
           How to close the chamber gently
           Experiences in DESY
           (c) movable table
           (d) design consideration on works in DR tunnel
           clean room, removal of beam pipe,
           usage of chain hoists
           (e) Space available in the tunnel
           (f) Design/Size of the clean room
           (g) Give copies of drawings/photos to LAL team
   12:00-13:30 Lunch
   13:00-15:30 Discussions (meeting room in ATF)
           General Discussion on 4-mirror cavities
           STATUS at Orsay (F. Zomer)
           Future Plans
   15:30-16:00 Break            
  16:00- Inspection in the DR tunnel (again)
  19:00 Meeting Dinner

22nd 

   9:00-12:00 Discussions (meeting room in the 3rd building)
           High Power Laser (M. Kuriki)
           Enhanced-cavity project (S. Viktor)
   LAL experiences in DESY (F. Zommer)
   12:00-13:30 Lunch
   13:30- Inspection in the DR tunnel (again)

 

Attendance

This Program pdf ..

報告資料のリンクファイルは、PDFの一部となっておりますのでご了承下さい。詳細希望の方は担当者まで連絡下さい。